Inspector QC E&I/ Supervisor E&I

Specializations:
  • Other

Employment: full time, part time, project work

Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work

Work experience 16 years 3 months

October 2019currently
5 years 8 months
Bureau Veritas Rus,

Russia, www.bureau-veritas.ru

Business Services... Show more

Inspector FAT electrical equipment.
1. Quality control of work on the manufacture of substation electrical equipment. 2. Monitoring of the individual stages of work, acceptance tests of electrical equipment, in accordance with the inspection plan. Issuing comments on the quality of work and monitoring their elimination. 3. Control of packaging, marking, the formation of passport and factory documentation and preparation for shipment of electrical equipment.
April 2019currently
6 years 2 months
TMS RUS, TUV International RUS

Russia

Inspector FAT electrical equipment
Inspection of quality control of work at production sites, manufactories, control of testing, (substation, low-voltage installation, metal-clad switchgear)
May 2016February 2019
2 years 10 months
Technip FMC, General Partnership SOUTH TAMBEY LNG, Moscow, Leninsky Prospect 15A. Branch of General Partnership SOUTH TAMBEY LNG, settlement of Sabetta, Construction Site of the LNG Plant. Quality Control Department.
Instrumentation Inspector
1. Supervise incoming control materials as well as instrumentation and electrical equipment. 2. Supervise subcontractors’ activities during installation and construction works. 3. QC of instrumentation and electrical equipment on construction sites. 4. Issue punch items to subcontractor on quality of works. 5. Supervise punch clearance. 6. Accept of separate stages, work packages, tests and completed objects as per the inspection and test plan. 7. Ensure work safety at the construction site.
October 2014April 2016
1 year 7 months
OOO Favorit Stroy

Samara

Chief Engineer
1. Develop the project implementation strategy and the organizational structure of the project. 2. Manage the project budget, assess risks. 3. Manage production and technical. 4. Supervise preparation of tender, budget and contractual documentation. 5. Participate in tenders in electronic trading platforms. 6. In-process supervision of the construction and reconstruction of objects. 7. Monitor project implementation (civil, E&I works) and report to the Customer.
March 2013July 2014
1 year 5 months
OOO RusVinyl (Nizhny Novgorod). Project Implementation Directorate. E&I Department. Construction of the Polyvinylchloride Complex.
Project Coordinator.
1. Organize and supervise E&I works on the construction sites. 2. Technical supervision over construction of facilities on construction sites. 3. Supervise keeping and preparation as-built documents for the supervised facilities. 4. Commissioning, accept separate stages, work packages and completed objects.
October 2011March 2013
1 year 6 months
OJSC SIBUR holding (Tobolsk) Construction Management Department. Construction of 500,000tpa Polypropylene Complex.
Power Engineer of Technical Supervision.
1. Organize and supervise electrical installation works on the construction sites. 2. QC of contractors’ work on construction sites. 3. Examine project documentation. 4. Commissioning, supervise finalized as-built documentation, accept completed work and signfinancial documents.
April 2011October 2011
7 months
ZAO Moody International (Moscow). Quality Control Department.
Senior QC Inspector.
1. Technical supervision over construction of objects at construction sites and production equipment in factories. 2. Supervise keeping and preparation as-built documents for the supervised facilities. 3. Accept separate stages, work packages and completed objects, shipment of equipment.
September 2010April 2011
8 months
CJSC Samara-Nafta (Samara). Field Facilities and Capital Construction Department.
Lead Engineer.
1. Organize and monitor contractors’ construction works. 2. Implement technical supervision of construction of oil-field pipelines (electrical, Instrumentation, general construction, welding). 3. Supervise keeping and preparation as-built documents for the supervised facilities. 4. Accept works and sign financial documents
February 2010July 2010
6 months
OOO Irkutsk Oil Company (Irkutsk), Yaraktinskoe field Electrical Engineer
Electrical Equipment Repair and Operation Engineer
1. Ensure a safe operation of electrical equipment and networks. 2. Maintain production documentation for the operated objects. 3. Monitor production of electrical work contractors. 4. Accept work and verify as-built documentation on construction objects.
June 2008August 2009
1 year 3 months
OOO TSUP VSTO (Angarsk). Construction Site No. 1.
Lead specialist of construction site No. 1 (city of Ust-Kut).
1. Organize and supervise construction and installation works performed by contractors. 2. Make design expertise of equipment installation and raise punch items. 3. Keep record of work performed by contractors and prepare reporting documents. 4. Participate in the work of committees, work groups for delivery and acceptance of completed objects.

Driving experience

Own car

Driver's license category B

About me

Integrated testing, Technical supervision, Quality Control, Develop the project implementation strategy, Manage production, Monitor project implementation, process supervision of the construction and reconstruction, Test Planning

Higher education

1996
Samara Technical University
Electrotechnical, Electrotechnical Installations and Systems

Languages

RussianNative


EnglishA1 — Basic


FrenchA1 — Basic


Professional development, courses

2018
Sertificate
National Register (NOSTROY)

Citizenship, travel time to work

Citizenship: Russia

Permission to work: Russia

Desired travel time to work: Doesn't matter