Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online more than two weeks ago
Candidate
Male, 59 years, born on 19 March 1966
Samara, not willing to relocate, prepared for business trips
electrical testing & commissioning engineer
3 000 $ in hand
Specializations:
- Design engineer
Employment: project work
Work schedule: full day, shift schedule, flexible schedule, rotation based work
Work experience 26 years 8 months
October 2018 — currently
6 years 9 months
ASU PRO, Ltd
Construction, Real Estate, Architecture... Show more
Electrical testing and commissioning engineer
Commissioning works. Work to verify the operability and commissioning of installed equipment and systems in general.Provide tests, commissioning of installed electrical equipment, substations, power distribution systems, relay protection, and control systems setting under construction gas facilities.
December 2014 — August 2016
1 year 9 months
Almaty, www.bolashak.com
Business Services... Show more
Electrical engineer. Commissionig.
Construction of a mining and processing plant for the processing of ore and the production of copper concentrate.
PURPOSE:
• Provide technical and engineering support to Commissioning Group, by liaising with Project Contractors and Client Team to deliver quality, cost and schedule objectives for the Bozshakol Process Plant and Infrastructure;
• Reporting to the Commissioning Manager, be the Clients Site Commissioning representative for Electrical areas for the Bozshakol Project..
JOB DUTIES:
• Proactively anticipate and resolve problems encountered in the field to avoid the need for costly re-work and schedule delay;
• Verify compliance with commissioning / construction documents, including safety standards, by monitoring project progress, onsite commissioning inspections, calculations and placements;
• Monitor Contractor quality control (QA/QC) systems and ensure these are operational and effective. Review and approve Contractors Field Inspection Checklists and Quality documentation from a commissioning stand-point;
• Liaise with Commissioning Team and the Construction Lead Electrical Engineer and Contractor Engineers in resolution of design problems and field changes;
• Review effectiveness and safety of Commissioning / Construction works and in compliance with applicable codes and regulations;
• Review Contractors work method statements and engineering deliverables as required;
• Monitor progress to ensure scheduling milestones are understood by Contractor and a plan is in place to meet these milestones;
• Liaise with KPBV Construction Team and Contractors Quality team to ensure that the specifications and quality standards are being achieved and adhered to in line with contract conditions;
• Assist Contract Administrator and provide technical support in Site Instructions and reports of progress measurement;
• Review technical change proposals from Contractor as required;
• Provide technical assistance for the construction completion, turnover and commissioning of the facilities as required. Provide the necessary client acceptance in handover documentation;
• Liaise with design team for monitoring of progress and to ensure engineering deliverables are being prioritised to meet Commissioning needs;
• Issue and follow Non Conformance Reports, Technical Queries and Project Deviation Notices (and other field engineering documents) as needed and close them out;
• Provide Engineering and Commissioning support to Commissioning Management when required;
• Complete regular progress reporting as required;
• Assist design engineering team with constructability input and communication of Kazakhstan engineering requirements and regulations, as required.
September 2012 — November 2014
2 years 3 months
Dalaro Ltd. Tengiz.
Electrical Engineer (first category)
. Commissioning of electrical installations at construction and operating facilities of Tengizchevroil Company.inspection and testing of cables,earthing systems, transformers,electric motors, electrical equipment of substations and switchboards,power generators,relay protection systems
From September 2013 I was appointed to the relay protection department of electrical laboratory for maintenance of the operating substations of the plant.
December 2010 — April 2012
1 year 5 months
PSN Kazstroy, АО
Senior Technician Electrical. Kashagan. Offshore. Major project in the oil industry of the Caspian region
Acceptance of completed electric installations, supervision of punch lists items clearance. Supervisor of a team consisting of 8-10 electricians and instrumental technicians for clearance of electrical and instrumentation punch lists items in accordance with hand over schedule.
September 2009 — December 2010
1 year 4 months
"MSS-PNU" Ltd,Commissioning department, Karabatan.Onshore. Major project in the oil industry of the Caspian region
Electrical engineer of electrotechnical laboratory
Acceptance of completed electric installations , inspection and testing of cables,earthing systems, transformers,electric motors, electrical equipment of substations and switchboards,relay protection systems, cathodic protectiion stations (oil storage tanks). High voltage tests, testing and setting of relay protection.
July 2007 — September 2009
2 years 3 months
"MSEM" Ltd, Mangystau district oil fields.
Commissioning engineer
Commissioning engineer of electrical equipment of substations and switchboards up to and over 1000 V. Examination and testing of electrical equipment for substations and switchboards: Transformers, bus bars, relay protection systems, start operations, part of the team responsible for maintenance of the plant for 1 year post completion
June 2006 — March 2007
10 months
"Semendi Kurylys" ltd, Tengiz. Major project in the oil industry of the Caspian region.
Electrical engineer QA/QC department
Quality control over electric instalations and pre-commissioning
June 2004 — December 2005
1 year 7 months
"Zhambul electric power plant" Ltd. Taraz city Power Plant for the southern region of Kazakhstan
Electrician
Main distribution system: 200 mW generators , 110, 220 kV power lines.Electrician responsible for relay protection and control circuits maintenance (testing, setting, repair)
June 2003 — February 2004
9 months
"Kazphosphate" Ltd, power supply derpartment
Chemical Production, Fertilizers... Show more
Electrician
Electrician responsible for relay protection and control circuits maintenance (testing, setting, repair)
September 1993 — July 2001
7 years 11 months
"Khimprom" Ltd, nitric and oxygen shop
Chemical Production, Fertilizers... Show more
Electrician
Electrician responsible for electric equipment maintenance, shift electrician ( 630 kw and 1720 kw electric motors of compressors and control circuits and other electrical equipment )
About me
Commissioning of substations and switchboards up to and over 1000V, control and protection circuits, microprocessing and other devices of relay protection and automation ( sepam, micom, multilin, ref and other), UPS, electric motors and control circuits(DOL and VSD). High-Voltage tests (hipot tests)
Work with technical, project, acceptance documentation, schematic diagrams, drawings of electric installations.
Basic computer skills, MS Office at user’s level.
Higher education
1997
Taraz State University
Electric drive and automation of engineering process, Electrical and Mechanical engineer
1989
Leningrad Polytechnic Institute
Faculty fof Electrical Engineering, 4 years
Languages
Professional development, courses
2001
Mordern methods of diagnostics of the substation equipment
Alma-Ata Power Engineering and Communication Institute, certificate N 152
Tests, examinations
2010
Basic Offshore Safety Induction and Emergency Training (BOSIET)
Agip KCO, successfully completed
2009
Permit To Work
AGIP KCO, successfully completed
Citizenship, travel time to work
Citizenship: Kazakhstan, Russia
Permission to work: Azerbaijan, Kazakhstan, Russia
Desired travel time to work: Doesn't matter